RMG600+ part of the Lower Embodied Carbon (LEC) range is a market first for Tate. Produced using a minimum of 86% recycled content & low carbon steel, this AS 4154-1993 approved raised access floor panel comes with a 25-year warranty. Ideal for demanding commercial office environments requiring low embodied carbon and high-performing solutions.
Fire Class | BS476-6 & BS476-7 Class 0 |
Reaction | EN13501:1 Bfl-s1 |
Resistance | REI30r |
Thickness | 31mm Nominal |
System Weight | 32.34kg/m2 Nominal |
Panel Size | 600mm x 600mm |
Core Material | 30mm high-density particle board |
Category | Screw down |
Steel pedestals are coated with environmentally-friendly clear passivation.
Alpha V pedestals are suitable for voids between 25mm to 610mm.
Pivot-head pedestals and nickel-plated pedestals are available upon request.
Standard or Acoustic pedestal adhesives are available.
Floor void heights from 25mm to 1200mm are available using standard pedestals. For heights outside of this range alternative pedestals are available.
This system is available with pre-drilled holes allowing the panels to be screwed down to the pedestals whilst still providing full access to the floor void.
Recommended for additional lateral stability in the following applications:
< 610mm void heights: clip-on stringer system
> 610mm void heights: screw-down stringer system
Point load 25 x 25mm | 3kN |
Load over 300 x 300mm | 4.5kN |
Uniformly Distributed Load (UDL) | 8kN/m2 |
Tested in accordance with AS 4154-1993 General Access Floors (Elevated Floors)
All working loads perform to a 3x safety factor.
Structural performance based upon a full Kingspan system, i.e. panels & pedestals.
Airborne Insulation (Dnfw) | 43 dB |
Impact Insulation (Lnfw) | 67 dB |
This system can be supplied with neoprene gaskets to minimise air loss through the raised floor surface from the underfloor plenum to aid air circulation, distribution and management.
SAFS is an approved Victorian distributor for Tate access flooring systems. We work on projects ranging from $2 000 and a few days’ work to $2 000 000 work carried out over several months.