logo
Overview
Technical Information
Downloads

Multi-Zone Opposed Blade Damper

Airflow Panels & Controls

The Multi-Zone Opposed Blade Damper allows for delivery of air only to where load is present, and confining airflow to where there is none. The reduction in airflow volume as a result of closing off airflow to unused sections of racks reduces energy expenditure at the CRAC unit level.

TALK TO US

Product Highlights

  • sustainablefloorsProvides more airflow at 100% than comparable slide dampers.
  • sustainablefloorsEasily adjustable from above without panel removal.
  • sustainablefloorsQuarter turn adjustment for 0-100% range.
  • sustainablefloorsFor use with full or partial loaded racks.
  • sustainablefloorsField-mounted dampers are attached to the bottom of the airflow panel.
  • sustainablefloorsField-mounted Multi-Zone Dampers are for use with DirectAire Al and DirectPerf 32% panels.
  • sustainablefloorsDrop-in damper design is for use with DirectAire and allows for easy retro.

Multi-Zone Opposed Blade Damper

The Multi-Zone Opposed Blade Damper enables individuals responsible for the physical infrastructure to deliver air where the IT user has servers and equipment installed, but restrict airflow delivery into zones where no blanking panels and no equipment is installed. Divided into three zones (top, middle and bottom), each zone of the manual damper can be adjusted from the surface without removing the airflow panel for fast, accurate balancing to the fixed IT loads.

Downloads

All FilesData SheetsSpecificationsTechnical Drawings

  • Data Sheet
  • Specifications
  • Technical Drawings

  • Multi-zone Opposed Blade Damper for DirectAire Datasheet
  • Multi-zone Opposed Blade Damper Datasheet

  • Multi-zone Opposed Blade Damper Field Mounted Specification
  • Multi-zone Opposed Blade Damper Drop-in Specification

  • Multi-zone Opposed Blade Damper for Drop-in Detail.DWG
  • Multi-zone Opposed Blade Damper Field Mounted Detail.PDF

Check out other products

SAFS is an approved Victorian distributor for Tate access flooring systems. We work on projects ranging from $2 000 and a few days’ work to $2 000 000 work carried out over several months.

We’ve worked with

Sustainable Data Centre Flooring Solutions by Sustainable Floors
© Sustainable Access Floor Solutions 2024 | All Right Reserved